Question
Download Solution PDFA and B can do a job in 25 days and 18 days, respectively. A works alone for 4 days and leaves. The number of days required by B to complete the remaining job is:
Answer (Detailed Solution Below)
Detailed Solution
Download Solution PDFGiven:
A can do the job in 25 days
B can do the job in 18 days
A works for 4 days and leaves
Calculation:
Assume total work = LCM of 25 and 18 = 450 units
A's rate = 450 ÷ 25 = 18 units/day
B's rate = 450 ÷ 18 = 25 units/day
⇒ Work done by A in 4 days = 4 × 18 = 72 units
⇒ Remaining work = 450 − 72 = 378 units
⇒ Time for B = 378 ÷ 25 = 15\(\frac{3}{25}\) days
∴ B will take 15\(\frac{3}{25}\) days to finish the job.
Last updated on Jul 22, 2025
-> RRB NTPC Undergraduate Exam 2025 will be conducted from 7th August 2025 to 8th September 2025.
-> The RRB NTPC UG Admit Card 2025 will be released on 3rd August 2025 at its official website.
-> The RRB NTPC City Intimation Slip 2025 will be available for candidates from 29th July 2025.
-> Check the Latest RRB NTPC Syllabus 2025 for Undergraduate and Graduate Posts.
-> The RRB NTPC 2025 Notification was released for a total of 11558 vacancies. A total of 3445 Vacancies have been announced for Undergraduate posts while a total of 8114 vacancies are announced for Graduate-level posts in the Non-Technical Popular Categories (NTPC).
-> Prepare for the exam using RRB NTPC Previous Year Papers.
-> HTET Admit Card 2025 has been released on its official site