Question
Download Solution PDFHow much of the electricity generated by the 750 MW Rewa ultra mega solar park is being provided to the Madhya Pradesh's power management company?
This question was previously asked in
MPPGCL JE Electrical 28 April 2023 Shift 2 Official Paper
Answer (Detailed Solution Below)
Option 2 : 76%
Free Tests
View all Free tests >
MPPGCL JE Electrical Full Test 1
3.9 K Users
100 Questions
100 Marks
120 Mins
Detailed Solution
Download Solution PDFThe correct answer is 76%.
Key Points
- The Rewa Ultra Mega Solar Park is one of the largest solar power plants in India with a capacity of 750 MW.
- Out of the total electricity generated, 76% is being provided to Madhya Pradesh's power management company.
- The remaining 24% is supplied to the Delhi Metro Rail Corporation (DMRC).
- The project is expected to significantly reduce the carbon footprint by providing clean and renewable energy.
- The solar park is a joint venture between the Madhya Pradesh Urja Vikas Nigam Limited (MPUVNL) and the Solar Energy Corporation of India (SECI).
Additional Information
- Solar Energy in India
- India is one of the countries with the largest production of energy from renewable sources.
- Solar energy is a key component of India's renewable energy strategy due to its abundant sunlight.
- The country aims to achieve 100 GW of solar power capacity by 2022 under the National Solar Mission.
- National Solar Mission
- Launched in 2010, it aims to promote the development and deployment of solar energy technologies in India.
- The mission targets large-scale deployment goals to increase the share of solar energy in the energy mix.
- It includes setting up ultra mega solar power projects, rooftop solar panels, and solar parks.
- Environmental Impact
- Solar energy helps reduce greenhouse gas emissions and dependence on fossil fuels.
- It contributes to the fight against climate change by reducing the carbon footprint.
- Solar parks like Rewa play a crucial role in promoting sustainable development.
- Economic Benefits
- Solar projects create job opportunities in the construction and maintenance sectors.
- They provide a boost to the local economy through infrastructure development.
- Cost-effective in the long run, solar energy reduces electricity bills and provides energy security.
Last updated on May 29, 2025
-> MPPGCL Junior Engineer result PDF has been released at the offiical website.
-> The MPPGCL Junior Engineer Exam Date has been announced.
-> The MPPGCL Junior Engineer Notification was released for 284 vacancies.
-> Candidates can apply online from 23rd December 2024 to 24th January 2025.
-> The selection process includes a Computer Based Test and Document Verification.
-> Candidates can check the MPPGCL JE Previous Year Papers which helps to understand the difficulty level of the exam.