Question
Download Solution PDFAcross which river is the Almatti Dam built?
Answer (Detailed Solution Below)
Detailed Solution
Download Solution PDFThe Correct Answer is Option 4 i.e Krishna.
Major Dams |
State |
Built across River |
Srisailam dam |
On the border between Andhra Pradesh and Telangana |
Krishna |
Nagarjuna Sagar dam |
On the border between Andhra Pradesh and Telangana |
Krishna |
Almatti Dam |
Karnataka |
Krishna |
Dhom dam |
Maharashtra |
Krishna |
Babli dam |
Maharashtra |
Godavari |
Jayakwadi dam |
Maharashtra |
Godavari |
Polavaram dam |
Andhra Pradesh |
Godavari |
Hirakud Dam |
Odisha |
Mahanadi |
Dudhawa Dam |
Chattisgarh |
Mahanadi |
Krishna Raja Sagar Dam |
Karnataka |
Kaveri |
Mettur dam |
Tamil Nadu |
Kaveri |
Upper Anaicut dam |
Tamil Nadu |
Kaveri |
Last updated on Jul 18, 2025
-> A total of 1,08,22,423 applications have been received for the RRB Group D Exam 2025.
-> The RRB Group D Exam Date will be announced on the official website. It is expected that the Group D Exam will be conducted in August-September 2025.
-> The RRB Group D Admit Card 2025 will be released 4 days before the exam date.
-> The RRB Group D Recruitment 2025 Notification was released for 32438 vacancies of various level 1 posts like Assistant Pointsman, Track Maintainer (Grade-IV), Assistant, S&T, etc.
-> The minimum educational qualification for RRB Group D Recruitment (Level-1 posts) has been updated to have at least a 10th pass, ITI, or an equivalent qualification, or a NAC granted by the NCVT.
-> Check the latest RRB Group D Syllabus 2025, along with Exam Pattern.
-> The selection of the candidates is based on the CBT, Physical Test, and Document Verification.
-> Prepare for the exam with RRB Group D Previous Year Papers.